Screens rarely fail at random. Erosion at the slot edges, blinding from fines, dissimilar-metal corrosion, installation damage and a wrong slot size account for most downhole failures. What each one looks like when the screen comes back.
Sand control screens almost never fail at random. When a screen comes back from a workover — or worse, is diagnosed by rising sand production while still in the hole — the failure usually lands in one of five modes, each with a distinct signature and a distinct prevention. This article walks the five, in roughly the order they occur in the field.
1. Erosion at the slot edges
The signature: sand production that ramps up gradually over months, slots that measure wide at the outside face when the screen is pulled. Produced sand abrades the slot mouth; a milled slot widens because its edges are cut, and even a drawn V-wire loses material at the face over enough tonnage. The prevention is on the wire, not the steel: a work-hardened drawn profile wears an order slower than a cut edge, and the wrap tension that keeps slot gauge along the whole jacket matters as much as the alloy. This failure mode is the deep argument behind wrapped screens over slotted liners — covered in the liner comparison.
2. Blinding by fines
The signature: declining productivity, no sand production, a screen that flows at half its test rate. Very fine, clay-rich or scaled solids bridge across slot mouths and the well chokes itself. Blinding is a completion-design outcome as much as a screen property: it gets worse with high drawdown, worse with carbonate scale in the water, and better with a slot geometry that widens inward and sheds instead of trapping. If the sand analysis said "fine and uniform", the screen conversation needs to happen before the completion does — the sizing logic is in the slot size article.
3. Galvanic corrosion of mixed alloys
The signature: a screen pulled after a couple of years with its support structure pitted or gone while the wrap wire looks new — or the reverse. A noble wrap electrically coupled to a lesser support, in brine, is a battery: the less noble metal becomes the anode and dissolves exactly where the welds are. This is the most preventable failure in the list, because the rule is one sentence: everything wetted is the same alloy, or chosen as a matched pair. The alloy side is worked through in the decision tree and the support side on the support bar materials page.
4. Mechanical damage at installation
The signature: a screen that sand-fails within weeks of a completion, with a dent, a collapsed band or a torn section at one depth. Jackets get racked, dragged through rotary tables, and point-loaded against centralizers; a dent that narrows the local slot by half doubles the velocity there, and erosion and sand production follow from the dent, not from the design. Prevention is handling discipline plus jacket stiffness — heavier wrap sections and tighter bar schedules, the trade-off described on the gravel pack screens page.
5. The slot was wrong from the start
The signature: immediate, sustained sand production on a brand-new screen. Either the slot was never sized against a real sand analysis, or the delivered jacket did not match the ordered gauge. The first is a design failure and is fixed by sieve data — D10/D50/D90, not habit; the second is a manufacturing failure and is fixed by the supplier measuring the wound jacket, slot by slot, at the outside face, and shipping the certificate. Both checks are described on the wire wrapped screens page, and a jacket supply route with per-jacket gauge certification is on the screen jackets page.
How the five map to a purchase decision
| Failure mode | What it implicates | Prevention lives in |
|---|---|---|
| Slot erosion | Surface type and wire quality | Drawn V-wire, wrap gauge discipline |
| Fines blinding | Completion design, drawdown | Sand analysis, slot geometry |
| Galvanic corrosion | Alloy pairing | Matched wetted alloys |
| Installation damage | Handling, jacket stiffness | Heavy sections, handling procedure |
| Wrong slot size | Design process, supplier QA | Sieve data, per-slot gauge certificates |
Send the failure screen or the well conditions — if a screen has already come back, send it or its photos. Reading the failure mode off the hardware is the fastest way to make sure the next one does not fail the same way.
More from ERQI
-
Technical
Wedge Wire Screens or Woven Wire Mesh: Choosing the Screening Surface | ERQI WIRE
Woven mesh costs less per square metre and wedge wire outlasts it by seasons. The real difference is the shape of the opening: one is a hole that plugs, the other is a slot that sheds. Where each surface wins, with the duties in between.
-
Technical
Wire Wrapped Screens or Slotted Liners: Which One Does the Well Need? | ERQI WIRE
Slotted liners cost a fraction of wire wrapped screens and fail in specific, predictable ways. The four well conditions that decide between them, and what each failure actually looks like downhole.
-
Technical
Choosing Slot Size on Oil Well Screens: From Formation Sand to Slot | ERQI WIRE
Slot size is a sand-retention decision made from a sieve analysis, not a catalogue pick. How D10/D50/D90 map to a slot, what changes when a gravel pack is involved, and where the field rules stop working.
Ready to start your project?
Send us your drawing or sample — we reply within 24 hours on working days.